PR No. 82
Petroleum Division corrects the facts of Machike-Thallian-Tarujabba White Oil Pipeline
Islamabad: February 15, 2024

The Machike-Thallian-Taru Jabba White Oil Pipeline (MTT-WOP) project aims to complete the oil pipeline backbone from Karachi to Peshawar apart from achieving the energy efficient movement of petroleum products as well as preventing adulteration and providing increased safety. It will connect Punjab from Machike, near Lahore, to Tarujabba, near Peshawar. The pipeline consists of two segments: Machike-Thallian and Thallian - Tarujabba along Motorway with connectivity options with Attock refinery, Chakpirana and Faqirabad. It completes the infrastructure supply chain from Karachi to Peshawar. This may be called a flagship project spearheaded by FWO and jointly supported by PSO and ISGS. The 477 km long pipeline, aims at ensuring a smooth supply chain of petroleum products from Karachi to Peshawar with initial carrying capacity of 7 MTPA extendable to 10 MTPA. The pipeline shall contribute significantly towards reduction of traffic congestion, environmental pollution and transportation cost. The signing ceremony of MoU between the Stakeholders on Consortium Formation for Machike-Thallian-Tarujabba White Oil Pipeline Project took place on February 14,2024 in Islamabad. The heads of consortium entities i.e. MD Pakistan State Oil (PSO) Syed Muhammad Taha, DG Frontier Works Organization (FWO) Major General Abdul Sami, MD Interstate Gas Systems Pvt. Ltd (ISGS) Nadeem Bajwa signed the historical Memorandum of Understanding.

PREVIOUS NEXT